Project: Greg's_RV-10   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Greg Kochersperger   -  
Project:   Vans - RV-10
Total Hours:1320.9
Total Flight Time:1.1
Start/Last Date:Jan 15, 2021 - No Finish Date
Engine:IO-540
Propeller:TBD
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=Greg's_RV-10

Home or Last Project Picture

Jun 07, 2021     10-17 & 10-23: Elevator bellcrank and battery tray - (2.8 hours)       Category: 10: Tail Cone
My nephew was in town so I saved a little project for him. He has a wet A&P so he should be able to handle it.

We separated and deburred the bellcrank parts then cleco'd and final drillled the holes through the center bearing. I assumed those were not final drilled.

Prepped and primed a small batch of parts including the remaining battery tray items.

Squeezed the rivets for the bellcrank assembly and finished the part.

Moved on to the battery nutplates. Might as well move ahead to bolting everything together as shown in 10-23. Found that I did need to final drill the 3/16” and 1/4” holes for the AN bolts to fit. Pretty cool assembly. I final torques the elevator bellcrank bolt but none of the others since the plans say not to.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.